- Preparation fees for Title 24 (required
energy calculations) documentation.
- Printing and reproduction
costs.
- Preparation of change orders.
- Travel or long distance calls
made in conjunction with the work.
- Preparation of perspective presentation
drawings or models.
- Services relating to future facilities
beyond the scope of the current project.
- Detailed estimates of construction
cost.
- Interior design and other similar
services required for or in connection with the selection
or installation of furniture, furnishings and related
materials.
This list is not prepared to describe
every condition of the services. It is presented to
help you with an understanding of what we do for our
clients during the design and construction phases of
the work. Our contract with you will cover all these
issues in greater detail. Please feel free to call us
and ask questions about this general overview.
|
|